House & Land Package
What you buy
The land and the home arranged together, under either one contract or two.
Where you can build
The release estates we are currently building in. The suburb filter on this page carries the current list.
Choosing your design
With two contracts, usually three to four floor plans are priced to your block, and internal fixtures and fittings can be upgraded at the Everyday Design Hub. A Ready Built Home is already approved for construction, so structural changes are not possible, though some internal selections may still be available depending on how far construction has progressed.
Contracts
One contract for a Ready Built Home, with a 5% deposit and the balance paid on completion. Or two contracts: one with us for the build and one with the developer for the land, where you pay stamp duty on the land contract only.
Price certainty
Fixed site costs, fixed certifying authority costs, fixed developer requirements and fixed price BASIX are covered by our House & Land 8 Point Guarantee.
Approvals
We manage the building approvals and applications for your package.
Typical timeframe
About 12 weeks to draw plans and obtain building approval once the land is transferred into your name, then 30 weeks to build a single storey home or 36 weeks for a double storey.
Suits you if
You want a new home in a growing community, with a clear fixed cost from the outset.
Building on Your Own Land
What you buy
The home only, built on land you already hold. Either a knockdown rebuild on your current block, or a build on a vacant block you already own.
Where you can build
Across our Sydney building area. See Where We Build. Some regions need a site inspection first.
Choosing your design
Your design is chosen and finalised before tender, so the home is matched to your block from the start.
Contracts
A single building contract with us.
Price certainty
The Everyday Advantage 8 Point Guarantee applies when you build on your own land, in accordance with your contract. It covers fixed site costs and a 365-Day Fixed Price Period across the building contract.
Approvals
We prepare the documentation for council development and construction approval.
Typical timeframe
Typically 10 to 12 months end to end for a knockdown rebuild, depending on approvals, services disconnection and site conditions. A vacant block follows the same process without the demolition stage.
Suits you if
You want to stay in the suburb you are already in, or you already hold a block and need the right home for it.